DIN EN 1838

Emergency & safety lighting

FireLux plans, installs and maintains safety and emergency lighting systems to DIN EN 1838 and ASR A3.4/3 — from compliant escape route design through to recurring inspection.

At a glance.

When the general power supply fails, a familiar corridor becomes an unknown space. Emergency lighting keeps rescue routes recognisable and passable until everyone has left the building.

Our scope covers compliant design of the escape routes, professional installation, and the regular inspection and maintenance that assures operational and legal certainty.

  • Design to DIN EN 1838 and ASR A3.4/3
  • Compliant layout of rescue and escape routes
  • Safety signs and illuminated escape route signage
  • Professional installation of self-contained and central battery systems
  • Regular inspection and maintenance including logbook

Kenndaten

Leitnorm
DIN EN 1838
Rated duration
1 h / 3 h
Regelwerke
5
Prüfpunkte
3

Standards & regulations.

The rules this work is planned, installed, signed off and maintained against.

DIN EN 1838
Standard 01 / 05

Applied lighting technology — Emergency lighting

Illuminance levels, uniformity and rated operating duration for escape routes and anti-panic lighting.

DIN VDE 0108-100
Standard 02 / 05

Emergency lighting systems

Installation and operation in buildings where people gather.

DIN EN 50172
Standard 03 / 05

Emergency lighting systems — Operation

Governs testing, test intervals and logbook records.

ASR A3.4/3
Standard 04 / 05

Emergency lighting and safety guidance systems

Arbeitsstättenregel — binding for workplaces.

DIN 4844
Standard 05 / 05

Safety signage

Design and use of escape route signs.

From survey to maintenance.

  1. 01

    Site survey

    Record the escape route layout, the existing luminaires and the condition of the batteries.

  2. 02

    Concept & planning

    Lighting design, luminaire positions, choice between self-contained and central battery.

  3. 03

    Installation

    Fitting the luminaires, escape route signs and supply equipment.

  4. 04

    Acceptance & commissioning

    Measurement of illuminance levels, function test, setting up the logbook.

  5. 05

    Maintenance & documentation

    Function and duration tests at the prescribed intervals, documented without gaps.

Inspect, maintain, document.

What has to be inspected how often — and the standard each interval rests on.

monthly
Inspection 01 / 03

Short-duration functional test

  • DIN EN 50172
annually
Inspection 02 / 03

Test of rated operating duration

  • DIN EN 50172
monthly
Inspection 03 / 03

Visual inspection of escape route signs

  • Operator's duty

What you get.

Benefit 01 / 03

Rescue routes stay recognisable

Including when the general lighting has failed.

Benefit 02 / 03

A logbook without gaps

Monthly and annual inspections documented — the first thing asked for during an inspection visit.

Benefit 03 / 03

Automatic test systems possible

Systems with self-testing considerably reduce the manual effort.

Questions.

Emergency lighting

Sprechen wir über Ihr Objekt.

Schildern Sie uns kurz die Situation — wir sagen Ihnen, was tatsächlich erforderlich ist und was es kostet.

(030) 240 32 950